Filling Cracks in Cement and Asphalt - Easy as 1,2,3

Your road or driveway was pristine the day it was completed.  Fast forward two, three or four years later, the sun, rain and constant use, have caused nasty looking cracks to appear.

Cracks eventually become potholes which are more expensive to repair.   Especially where there is heavier traffic on roads, the constant change in pressure from the tires of heavy, high speed vehicles, causes the area around the cracks to flex and weaken, eventually becoming a pothole. 

The solution, re-surface.   But with budget being the main consideration, invariably the cracks remain and eventually turn into a much bigger problem.     There are many methods being applied to combat the crack problem.

                 4Seasons™ to the rescue.

Our Crack Filler is actually 4Seasons™ pothole filler, but with less Part B aggregate, which makes it much more pourable.      The process is as easy as 1, 2 , 3.   Open the bucket and remove the contents. 

1 - Shake Part A liquid and pour into bucket. 
2 - Pour in the Part B aggregate and stir for approximately 40 seconds or until the product is liquified.  
3 - Pour 4Seasons™ Crack Filler into cracks and allow 60 to 90 minutes to set.
    That's as simple as it gets.  No need for special equipment or skills.  Just some arm muscle motion and about 3 to 4 minutes to do the repair job. 

    One of the great successes of  4Seasons™ pothole and crack filler, is it's flexibility.   The product hardens but remains pliable.  So even after a lot of use, the product remains bonded to the surrounding material for as long as that material remains intact.  

    For repairs to cement cracks, we recommend using our Primer first.  Clean the cracks from loose dirt and water, then apply the Primer with a throw away paint brush.  Allow to set and bond with the surrounding concrete for about 30 minutes, then follow the steps described above  1,2 and 3 


    Please visit our "How To" section of our web site for more detail on Cracks and other repairs.